PMP考試每天一練-2020年PMP考試練習題152
PMP考試練習題一: A project manager is assigned to a project with a rapidly changing environment. The requirements scope is difficult to define in advance, which of the following project life cycle models should assist the project manager to define small incremental improvements and deliver best value to stakeholders? A. Iterative and incremental life cycles B. Adaptive life cycles C. Predictive life cycles D. Phase-to-phase relationships 項目經理被分配管理一個具有快速變化環境的項目。需求范圍難以提前定義。下列哪一個項目生命周期模型應協助項目經理定義較小的增量改進,并為干系人提供最大價值? A.迭代性和增量型生命周期 B.適應性生命周期 C.預測型生命周期 D.階段到階段關系 PMP考試答案解析:應對快速變化的環境,使用適應型生命周期。 PMP考試參考答案:B PMP考試練習題二 As a result of the Control Quality process, change requests are generated and approved by the change control board. What should the project manager do next? A. Evaluate the change requests with the change control board B. Schedule the implementation of the approved changes C. Evaluate the risk if the changes are not implemented D. Perform a root cause analysis to identify the sources of the changes 作為控制質量過程的結果,產生變更請求,并由變更控制委員會批準。項目經理下一步該怎么做? A.與變更控制委員會一起評估變更請求 B.安排批準變更的實施 C.評估如果不實施變更的風險 D.執行根本原因分析確定變更的緣由 PMP考試答案解析:變更請求被批準了,下一步是更新項目計劃、實施變更。 PMP考試參考答案:A |